STAGE 3: TOMBSTONE ROAD RACE
Sunday, April 27, 2008; 8:00 AM
NOTES(PK) Parking for the start will be in the City of Bisbee lot behind the Copper Queen Plaza (the large brown building). The sign-in sheet will be at the STAGING AREA. Event 'A' will start at 8:10 AM, Event 'B' at 8:20 AM, and Event 'C' at 8:30 AM.
CoveredTo Go 
087.2(o) START: Riders will "neutral" parade up Tombstone Canyon to U.S. Hwy. 80 (1.7). Proceed up through tunnel and down the divide.
8.656.8{1: Turn LEFT onto State Hwy. 90.
19.645.8{2: Turn RIGHT onto Moson Road. Watch for potholes
22.742.7{3: Turn RIGHT onto Charleston Road. CENTER LINE ENFORCED!
25.240.2 Rough railroad crossing & cattle guard with break on left side right past bridge @ San Pedro River.
31.534.3FEED ZONE
34.331.1{4: DOG LEG: Turn RIGHT onto Allen St. - LEFT onto 2nd St. & RIGHT onto Fremont St. (U.S. Hwy. 80). CENTER LINE ENFORCED!
34.830.6"SPRINT" at the "PEDESTRIAN OVERPASS". Proceed straight on U.S. Hwy. 80
55.410.0{5:Passing lane: STAY TO RIGHT OF WHITE LINE!
56.58.9{6:Proceed straight down through tunnel. Riders in Events 'B' & 'C' will bear RIGHT at the 1st EXIT (tight turn), then turn LEFT onto West Blvd. ( tight off -camber turn), & proceed up to the finish line. Riders in Event 'A' will go past both exits into Old Bisbee & the Lavender Pit.
58.40[o] EVENT B & C FINISH:
60.64.8{7:Enter the Roundabout; Go all the way around and proceed back up U.S. Hwy. 80.
62.43.0{8:Proceed up past the Lavender Pit. and Old Bisbee to the EXIT at West Blvd. Turn RIGHT (tight turn), then RIGHT onto West Blvd., & proceed up to the finish line.
87.20[o] EVENT A FINISH:
COURSE PROFILE; .pdf file, zoom in for better view.
TOTAL CLIMBING: Event A: 6,427 ft., Events B & C: 4,356 ft.
Flash graphic, right click to zoom in.